A crane mounted on a truck carrier provides the mobility for this type of crane. This crane has two parts: the carrier, often referred to as the Lower, and the lifting component which includes the boom, referred to as the Upper. These are mated together through a turntable, allowing the upper to swing from side to side. These modern hydraulic truck cranes are usually single-engine machines, with the same engine powering the undercarriage and the crane. The upper is usually powered via hydraulics run through the turntable from the pump mounted on the lower. In older model designs of hydraulic truck cranes, there were two engines. One in the lower pulled the crane down the road and ran a hydraulic pump for the outriggers and jacks. The one in the upper ran the upper through a hydraulic pump of its own. Many older operators favor the two-engine system due to leaking seals in the turntable of aging newer design cranes.
1,Crane capacity from 2Ton to 25Ton , include boom crane and Jib crane ,crane can be located at rear of cabin or rear of cargo according to customer requiremetns.
We also can sell crane only to install it on customer's chassis ,we can provide you drawing and other necessary information for installation .
crane brand like CLW , SANY-PALFINGER, SHIMEI, UNIC,etc .
2,Chassis can be choose others like FAW , ISUZU , SINOTRUCK, FOTON , JAC , JMC ,SHACMEN ,NORTH BENZ , ETC ,
3, cargo dimension is according to customer requirements and chassis .
3, Warranty period is 8000KM or 12 month which comes first .
4,so if you have such requirements ,please contact me with cell phone 86-13872885121 .
specification of Military 6X6 7ton loader truck with knuckle Crane truck
Photo of dongfeng military 6x6 7Ton truck crane



certificate of factory :

FAQ:
LC terms is also can be accepted .
Fuel tanker trailer:15-20days
Garbage truck:15 days
Sweeper road truck:25 days
Wecker truck:7-10 days
Suction sewage/Fecal truck:7-15 days
Crane truck:15 days
Refrigerator/Van truck:7-15 days
Dump truck:20 days
Concrete mixer truck:7-25 days
LPG :20-30 days
LED truck:7-15 days
(the above is left hand drive chassis ,if you need the right hand drive chassis ,delivery time is longer than Left hand drive truck,Detailed clauses are subject to contract .)
We have been in this line for over 15 years, dealing with all kinds of special trucks and trailers.
1,Crane capacity from 2Ton to 25Ton , include boom crane and Jib crane ,crane can be located at rear of cabin or rear of cargo according to customer requiremetns.
We also can sell crane only to install it on customer's chassis ,we can provide you drawing and other necessary information for installation .
crane brand like CLW , SANY-PALFINGER, SHIMEI, UNIC,etc .
2,Chassis can be choose others like FAW , ISUZU , SINOTRUCK, FOTON , JAC , JMC ,SHACMEN ,NORTH BENZ , ETC ,
3, cargo dimension is according to customer requirements and chassis .
3, Warranty period is 8000KM or 12 month which comes first .
4,so if you have such requirements ,please contact me with cell phone 86-13872885121 .
specification of Military 6X6 7ton loader truck with knuckle Crane truck
Vehicle model | CLW5250JSQ3 | ||
Manufacture | Hubei Chengli Special Automobile Co.Ltd | Brand | CLW |
Overall dimension(mm) | 760,7825×2500×2845,2925 | GVW(Kg) | 16050 |
Cargo dimension(mm) | 4800,×2294×800,550 | Loading weight(Kg) | 8000 |
Approach/departure angle | 20/13 | Curb weight(Kg) | 4955 |
Front/rear overhang(mm) | 1460/2870,1460/3520 | Max speed(km/h) | 85 |
Chassis model | DFL1250A9 | ||
Engine model | Cumins 160HP | exhaust | 5900L |
Fuel | Diesel | Emission standard | Europe III |
Wheel no | 3 | Tyre No | 10 |
Wheel base | 3475+1250 | Tyre model | 12.5R20,with autoinflation system |
Gear box | Dongfeng 6 speed ,1 reverse | Clutch | Φ350mm |
Brake | Exhaust suspension brake | Axle | tandem axles |
Fuel tanker | 350L | Rear winch | 44100N tractor capacity(optional) |
Crane specification | |||
Crane model | SQ135ZK2Q | ||
Max lifting moment | 13.23 T.M | Max lifting weight | 6300kg |
Max hydraulic flow | 25L/Min | Hydraulic oil tanker | 90L |
Crane weight | 2115KG | Max power | 28KW |
Lifting height | 11M | Working ratio | 8M |
Lifting capacity | 1.2Ton@length 8M ,1Ton@ height 11M |
Photo of dongfeng military 6x6 7Ton truck crane



certificate of factory :

FAQ:
Q1. Quality control
A:We make quality control for each step while producing and before shipping.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
LC terms is also can be accepted .
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.DAP etc .
Q4. How about your delivery time?
A: Generally, it will take 10 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
For standard products, delivery time is as below:
Water tanker truck:7 daysFuel tanker trailer:15-20days
Garbage truck:15 days
Sweeper road truck:25 days
Wecker truck:7-10 days
Suction sewage/Fecal truck:7-15 days
Crane truck:15 days
Refrigerator/Van truck:7-15 days
Dump truck:20 days
Concrete mixer truck:7-25 days
LPG :20-30 days
LED truck:7-15 days
(the above is left hand drive chassis ,if you need the right hand drive chassis ,delivery time is longer than Left hand drive truck,Detailed clauses are subject to contract .)